Turkey Commercial Freezer OEM · 8,000 cabinets/year turnkey line

Vertical and chest commercial freezer OEM in Bursa replaced aging Cannon line with URexceed turnkey package. Mold + machine + commissioning delivered in 14 weeks at 56% of Cannon quote.

Customer Type

Commercial freezer OEM

Industry

commercial-freezers

Project Scale

8,000 cabinets/year — vertical + chest mix

Duration

14 weeks delivery + 2 weeks commissioning

The Challenge

Aging Cannon line from 2003 had density tolerance drifting to ±3 kg/m³ and required full retooling for new SKU launches. Replacement quote from Cannon was EUR 1.4M with 32-week lead time. Capex ceiling was set at $700K, and production downtime over 8 weeks would cost the OEM core retail customers.

Our Solution

URexceed delivered URX-TURNKEY package with custom multi-cavity mold (3 cabinet sizes) and URX-FOAM-60 hydraulic piston machine at $620K. 14-week delivery hit before old line shutdown. Commissioning included operator training, recipe storage for 12 SKUs, and Türkiye spare parts hub registration. Density tolerance returned to ±1 kg/m³.

Project Results

56%

Capex savings

vs Cannon EUR 1.4M quote

14 weeks

Lead time

vs Cannon 32 weeks

±1 kg/m³

Density tolerance

matches original Cannon spec

8,000 cabinets

Annual output

+15% vs old line capacity

Planning a similar project?

Share your output, voltage, and project scale. Pioneer recommends a matched JYYJ machine + material combination within 24 hours.

Get a Matched Quote

Representative Project: Technical parameters and project outcomes reflect what Pioneer equipment and materials can deliver in similar scenarios. Customer-specific details are held under NDA; full documented case studies available on request.

Get a Quote