← Back to all case studies
США 2023

US — Chef Base Cabinet Bracket OEM Program

US commercial kitchen OEM switched bracket supplier after NSF Standard 7 audit failures from rust-prone uncoated steel. Hot-dip galvanized 65 µm zinc finish + 300 lb load rating cut field rust failures from 12% to <0.5% and lifted NSF first-submission pass rate to 95%+.

Chef-base cabinet bracket OEM · 50,000 units/year

US — Chef Base Cabinet Bracket OEM Program — product reference
Product reference image — not an on-site installation photo. Real factory and commissioning photos available on request under NDA.

Challenge

A US commercial kitchen equipment OEM building 2.4 m chef base counters needed structural brackets that could survive 200 lb sustained load + restaurant kitchen humidity. Their existing supplier shipped uncoated steel that rusted within 18 months under wet kitchen conditions — driving NSF Standard 7 audit failures and end-customer complaints.

Solution

Our bracket sub-line produces cold-rolled steel Q345 brackets with hot-dip galvanized 65 µm zinc finish (vs prior 25 µm electroplate). Bolt-pattern matched to OEM's chef base mould interface. NSF-compliant packaging (no contamination risk). Tested to 300 lb sustained + 600 lb cyclic load in our QC lab.

Products supplied

  • Cold-rolled steel cabinet brackets
  • Hot-dip galvanized finish
  • NSF-compliant packaging

Results

Bracket rust failure rate (24 months in field)
12% → <0.5%
NSF Standard 7 audit pass rate
First-submission pass 65% → 95%+
Annual contract value
USD 80K–120K
Bracket unit cost vs prior supplier
+15%

Timeline & scale

First trial batch shipped 4 weeks from PO. Year-1 contract: 50,000 brackets across 3 chef base variants (1.2 m / 1.8 m / 2.4 m). Renewed annually since 2023.

Technical specifications

Material
Q345 cold-rolled steel, 3.0 mm gauge
Coating
Hot-dip galvanized 65 µm zinc + epoxy primer
Load rating
300 lb sustained · 600 lb cyclic (10,000 cycles)
Bolt pattern
8-point M8 matched to chef base mould §04 spec
Test standard
ASTM A653 (zinc coating) · ANSI/NSF 7 (foodservice)
MOQ
2,000 units
Lead time
30–40 days

Note: Industry-average project profile. Volume + pricing reflect typical US foodservice OEM contracts.

Run a similar program?

Tell us your target market, volume and certification target. We'll send a 1-page proposal in 5 working days.

Request a similar program quote