UREXCEED factory

30 yıldır soğutma ekipmanı fabrika çözümleri

UREXCEED has worked with refrigeration moulds and PU foaming equipment since 1995. Our focus is the insulation-foaming stage for refrigerator, freezer and commercial refrigeration products.

We coordinate the moulds and fixtures, PU dosing and mixing equipment, handling line, controls, installation and commissioning needed for that stage. The final configuration is confirmed from your product drawings, foam system, target output and factory layout.

Our scope is specific: we supply and integrate PU foaming equipment and tooling. Refrigeration circuits, compressors, charging, final assembly and finished-appliance certification remain outside our standard scope unless they are explicitly listed in the project contract.

What We Actually Deliver

A stable foaming process depends on the fixture, material metering, injection method, curing time and handling line working together. We configure those parts as one foaming-stage solution.

Cold-Chain Moulds & Tooling

Vacuum-forming liners, foaming moulds, door moulds and fixtures — built by the Chuzhou–Kunshan mould cluster we have worked with for 30 years.

PU Foaming Machines

High-pressure (two-/three-component and cyclopentane), low-pressure, spray and glue-dispensing machines, matched to your cabinet size and output.

PU Foaming Lines

Ground-rail door lines, linear cabinet lines and rotary door lines configured around the required takt, curing dwell and loading method.

Process Integration

Material metering, temperature control, mixing heads, safety devices and controls matched to the agreed PU system and line layout.

Why the Foaming System Is Specified Together

One Accountable Partner

The mould, fixture, dosing system and handling line are reviewed against one agreed product and process specification.

Specified Together, Not Bolted On

Mould geometry, foam shot weight and line speed are designed as one system. That is the difference between a line that hits rated output and one that fights itself.

Support After Commissioning

Installation, commissioning, training and warranty conditions are stated in the project contract so both sides know the handover boundary.

The team behind every line

The People Who Run Your Project

Mould, PU-process, line-layout, controls and commissioning work are coordinated against the same approved product drawings and foaming specification.

1995
Work in refrigeration tooling began
1
Approved project specification
FAT
Agreed checks before shipment
Site
Commissioning scope by contract

Mould Design Engineers

Vacuum-forming, foaming and door moulds engineered to your cabinet bill of materials.

PU Process Engineers

Foam density, shot weight and cream/gel timing tuned to your cabinet size and ambient.

Line-Layout & Automation

Ground-rail, linear and rotary-door layouts sized to your takt time and floor space.

On-Site Commissioning

Engineers travel to your plant to install, calibrate and bring the line to steady-state yield.

Project Management

One PM owns the schedule from contract to first-article approval — a single point of contact.

After-Sales & Service

Warranty, spare-parts and remote-support terms follow the signed project scope.

Group & partner factory network

How One Foaming Specification Connects the Work

UREXCEED coordinates the specialist sources used for the agreed PU foaming stage. The scope is limited to the moulds, fixtures, dosing and mixing system, line handling and services named in the contract.

Your Foaming Project
One approved scope · one project contact · defined acceptance criteria
UREXCEED
Integrator & Project Owner

Specialist partner factories we coordinate

Mould & Tooling Partners

Vacuum-forming, foaming, door and fixture moulds from the Chuzhou–Kunshan cluster.

PU Machine Builders

High- and low-pressure, spray and glue-dispensing machine shops, including our in-group PU-machine partner.

Line Automation Builders

Conveyors, ground-rail tracks and assembly automation matched to the line.

PU Process Inputs

The agreed polyol/isocyanate system and safety requirements used to configure the foaming equipment.

How we run the network for you

01

Specify together

Mould, foam and line speed designed as one system.

02

Source & review

The selected source and available quality documents are reviewed for the project.

03

Integrate

We combine moulds, machines and automation into one line.

04

Factory Acceptance Test

Agreed functions and sample conditions are checked before shipment.

05

Site handover

Installation, commissioning and training as defined in the contract.

Where We Work

We support overseas projects from specification review through FAT, shipment, installation and commissioning. Applicable machinery compliance and material test documents are confirmed for each quoted model and destination rather than claimed for every product.

How Our Foaming Capability Developed

1995
Started with refrigeration moulds and tooling in Jiangyin
2005
Added PU dosing and mixing equipment integration
2012
Expanded overseas installation and commissioning support
2018
Developed multi-station cabinet and door foaming configurations
Today
Focused on project-specific PU foaming lines, fixtures and moulds