Inspection, FAT, commissioning and warranty requirements are written into the project specification. The checks and documents supplied depend on the equipment model, material system and destination market.
5-Stage Quality System
The project quality plan is agreed before manufacture, with acceptance criteria tied to the contracted equipment and sample parts.
Supplier Audit & Pre-Qualification
The manufacturing source, production capability and available quality documents are reviewed for the equipment included in the project.
Inbound Material Inspection (IQC)
Specified mould steel, purchased components and relevant material documents are checked against the approved bill of materials. Project-specific tests are listed in the quality plan.
In-Process Quality Control (IPQC)
Critical fixture dimensions, assembly points and control functions are checked at defined hold points. The records included at handover are confirmed in the contract.
Pre-Shipment Factory Acceptance Test (FAT)
FAT is run against agreed test conditions: available sample parts and materials, utilities, cycle sequence, safety functions and acceptance criteria. Third-party witnessing can be arranged when included in the order.
On-Site Commissioning & Warranty Tracking
Site work, operator training, handover tests and the warranty start date follow the signed project scope. Travel, utilities, materials and production support responsibilities are stated before dispatch.
Quality Control in Action
What the five-stage system looks like on the shop floor — actual checkpoints, not marketing language.

Incoming Material Inspection
Every mould steel billet, PU raw material barrel, and electrical component is dimensionally verified and cross-checked against mill certificates before it enters production.

In-Process Monitoring
PU foaming pressure, temperature, density and cycle time are logged in real time at every station. Any deviation from the production recipe triggers an immediate stop-and-correct action.

Pre-Shipment Acceptance Test
Every line runs a full production cycle on the supplier factory floor before shipping. Clients (or SGS / BV / TÜV / Intertek inspectors) are invited to witness, and a written FAT report is issued.
Testing Methods & Standards
Our equipment and materials are tested against the standards your buyers require.
Quality Management
Machinery Compliance
PU Material Testing
Fire-Performance Testing
How We Verify Certification Scope
Warranty & Service
The quotation and contract define the warranty start date, covered assemblies, exclusions, response channel and responsibility for travel or on-site service.
Global Service Footprint
On-site intervention available in every region where we have delivered projects.
Request Our Quality Documentation
TDS, SDS, FAT report samples, ISO 9001 certificate, and customer testimonials are available on request for serious project enquiries.