Moule de moussage — caisson et porte (UFM-CAB-2200) is a ISO 9001 / CE-certified moules pour équipements de réfrigération product manufactured by UREXCEED. Lead time: 60 – 90 days. MOQ: 1 set. Key applications: Refrigerator cabinet foaming, Freezer cabinet foaming, Door foaming.
UFM-CAB-2200
Moule de moussage — caisson et porte
Structure Q345 avec chauffage intégré
Spécifications
- Frame Material
- Q345 steel welded structure
- Clamping Force
- 5 – 50 tons hydraulic / pneumatic
- Temperature Control
- 40 – 55°C ±2°C heated platen
- Size Range
- 600 × 600 mm up to 2,200 × 900 mm
- Cycle Time
- 4 – 8 min per unit
- Automation Level
- Manual / semi-auto / fully-auto
Applications
- Refrigerator cabinet foaming
- Freezer cabinet foaming
- Door foaming
Certifications
Questions fréquentes
Quel est le délai de livraison typique ?
Quelle est la quantité minimale de commande ?
Proposez-vous la personnalisation et l'OEM / ODM ?
Quelles certifications ce produit possède-t-il ?
Produits associés
UVM-RL-2200
Moule de thermoformage — cuve intérieure
Moules en alliage d'aluminium, précision ±0,05 mm
UDM-COMBO-900
Moule de porte — thermoformage + poinçonnage + moussage
Moules intégrés pour réfrigérateurs, refroidisseurs et vitrines
UPM-PROG-400
Moule de poinçonnage et découpe
Moules progressifs, Cr12MoV, HRC 58-62
Cross-Sell · One-Partner Synergy
Pair These Moulds With Your Production Line
Cyclopentane high-pressure machine + matched PU raw materials = the proven refrigerator factory recipe.
Cyclopentane High-Pressure PU Machine
The refrigerator-industry standard pairing for vacuum-forming and foaming moulds. Ask about UPM-HP-CYP series.
Learn morePU Raw Materials System
BASF / Covestro / Wanhua MDI + Polyol calibrated to your moulds geometry and target foam density.
Learn moreRefrigerator Production Line Solution
Pair these moulds with our turnkey factory engineering — 1,800+ delivered projects in 40+ countries.
Learn moreService & Support
Garantie & Service
Intervention sur site disponible dans chaque région où nous avons livré des projets.
On-Site Installation
Our engineers fly to your factory to supervise installation, layout verification, and first-run production.
Commissioning + Tuning
Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.
Operator Training
5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.
3-Year Warranty + Spares
Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.
home.stats.heading
Turnkey Production Lines for Refrigeration Equipment Factories
"From a Single Pump to a Turnkey Line — One Partner Through Every Tier."
Besoin d'une solution complète de réfrigération ?
UREXCEED intègre moules, machines de moussage, lignes de production et matériaux au sein de 6 usines partenaires. Indiquez-nous votre objectif de capacité et nous répondrons avec une configuration et un devis sous 24 heures.