Линия вспенивания для корпусов HVAC (AHU)

Решения для

AHU cabinet PU foaming lines for HVAC equipment manufacturers

HVAC air-handler unit (AHU) cabinets require PU-foamed sandwich panels for thermal insulation and acoustic damping. We supply the PU foaming line, foaming moulds and insulation material system for AHU cabinet panel production — 30 – 150mm panel thickness, 50 – 500 cabinet sets per day.

In one line

2 HVAC cabinet OEM projects delivered — focused exclusively on the insulated-cabinet panel stage, the narrow slice of HVAC plant where PU foaming expertise matters most.

!
Рамки поставки — что мы поставляем и что нет

Scope: UREXCEED supplies only the PU foaming line and moulds for HVAC air-handler (AHU) cabinet production. We do NOT supply compressors, condensing units, refrigerant systems, or full HVAC plant turnkey solutions — contact a dedicated HVAC OEM integrator for those.

Типовой масштаб
50 – 500 cabinet sets / day
Product Range
AHU air-handler cabinet panels, 30 – 150mm PU insulation thickness
Типичные клиенты
  • HVAC cabinet OEMs
  • Air handler unit manufacturers

Real pains we hear from buyers — and what we ship to solve each one

Four pains every HVAC AHU cabinet factory founder brings us. Our line clears each — staying inside scope (cabinet only, not the full AHU plant).

Pain 1

AHU cabinet panel thermal bridge — building HVAC engineer rejects spec on heat loss calculation

How we solve it

Thermal bridges form at panel-to-frame joints when PU foam doesn't reach edges evenly. Our cabinet mould design fills the full perimeter to ±0.3 mm thickness uniformity. Foam k-factor 0.022–0.024 W/m·K verified shot-by-shot. Joint thermal break gasket integrated into mould geometry. Field-measured U-value: 0.5–0.7 W/m²·K (well below 1.0 W/m²·K threshold).

Pain 2

AHU acoustic spec (LEED healthcare hospital projects) — STC 40 minimum, my current panels only hit STC 32

How we solve it

STC is foam density + panel thickness + panel-to-panel joint design. We tune PU formulation to density 45–50 kg/m³ (vs standard 38–42), panel thickness 50–80 mm, and ship the acoustic test chamber (USD 65K–140K) for ISO 717-1 STC measurement on every cabinet variant before shipping to LEED/healthcare buyers. Field STC: 42–48.

Pain 3

Project-based orders with different sizes per building — modular tooling not flexible enough

How we solve it

Our foaming moulds are reconfigurable ±20% from base mould dimensions (e.g., 1.2×2.4 m base mould covers 0.96×1.92 m to 1.44×2.88 m). Truly custom sizes outside ±20% range need new mould inserts (USD 60K–140K). Most AHU factories carry 3–5 base moulds covering 80% of project orders, plus inserts for major repeat sizes.

Pain 4

Cabinet supply scope vs full AHU plant — buyer keeps asking for fans, coils, motors which I don't supply

How we solve it

AHU plant = cabinet + coil + fan + filter + motor + controls. We supply ONLY the cabinet (foaming line). To keep buyer expectations clean: we ship a scope-boundary letter with every quote stating what's in scope (cabinet panels + foam + finish) and what's out (mechanical components). Most AHU brand customers source coils from Bohn/Bitzer, fans from Ziehl-Abegg/EBM-Papst, motors from ABB/WEG independently.

From inquiry to first commercial unit — the 6-step delivery flow

From inquiry to first AHU cabinet rolling off your line. ~7 months for a 200 units/day AHU cabinet line — faster than refrigerator lines because cabinet structure is simpler.

Линия вспенивания для корпусов HVAC (AHU) — production line reference
  1. 1

    Inquiry & Scope Boundary Confirmation

    Week 1–2

    Share target capacity, AHU segment (commercial / healthcare / data center / LEED), cabinet size range, target acoustic + thermal spec. We send 1-page proposal + scope boundary letter (cabinet only, mechanical components sourced by you) in 5 days.

  2. 2

    Detailed Proposal & Acoustic / Thermal Spec

    Week 2–3

    Engineering picks base mould platform sized for 80% of your project order range, PU formulation per acoustic + thermal target, acoustic test chamber if LEED/healthcare positioning. Quote with 16-line BOM in 10 days.

  3. 3

    Contract & Panel Design Freeze

    Week 3–5

    30% down. Panel CAD + joint geometry + foam density target frozen. Acoustic / thermal targets signed off.

  4. 4

    Mould + Acoustic Chamber Build

    Month 2–4

    Cabinet moulds: 45–60 days. PU machine: 45 days. Acoustic test chamber (if optioned): 60 days. Pre-shipment FAT — we run trial cabinets and ship the acoustic + thermal validation report.

  5. 5

    Sea Freight & On-Site Installation

    Month 4–6

    3–4 × 40' containers from Shanghai/Ningbo. On-site installation 2–3 weeks. Standard concrete floor, normal ceiling height — minimal building modifications.

  6. 6

    Commissioning, Acoustic / Thermal Testing & Acceptance

    Month 6–7

    First 30 trial AHU cabinets produced + tested through thermal U-value + STC acoustic protocols. Operator training. Acceptance signed when 20 consecutive cabinets pass thermal + acoustic spec. 60% payment due here.

Почему эта линия работает — цифры берутся из реального оборудования

Специализированная линия вспенивания для панелей корпусов AHU. Не полный HVAC-завод — см. ограничения области применения ниже.

1

Толщина панелей AHU 30–150 мм на одной линии

Вспенивание ПУ с регулируемой толщиной панели корпуса от 30 мм (лёгкий коммерческий AHU) до 150 мм (промышленный AHU с повышенным требованием к звукопоглощению). Та же база линии, зазор двухленточного пресса регулируется под спецификацию панели — отдельная оснастка не требуется.

2

Плотность ПУ 38–58 kg/m³ для баланса тепловой и акустической характеристик

Панели AHU должны балансировать R-значение (теплоизоляция) с акустическим демпфированием (звукопотери). Плотность пены 38–45 kg/m³ для шкафов с приоритетом теплозащиты, 48–58 kg/m³ для шкафов с акустическим приоритетом в здравоохранении, дата-центрах и лабораториях.

3

Модульная мощность от 50 до 500 комплектов шкафов в сутки

Компоновка линии стартует с 50 комплектов шкафов/сутки для новых OEM-программ HVAC и масштабируется до 500 комплектов/сутки. Объёмы OEM-производства AHU ниже, чем OEM-производства холодильников (больше вариаций SKU, меньшие партии), поэтому гибкость оснастки важнее запаса мощности.

4

Совместимость с оцинкованной / нержавеющей / алюминиевой обшивкой

Оснастка линии вспенивания совместима с оцинкованной стальной обшивкой (стандарт коммерческих установок), нержавеющей (пищевая промышленность/фарма) и алюминиевой (дата-центры / прибрежный монтаж). Смена материала обшивки требует только корректировки адгезива/подготовки поверхности, а не замены оснастки.

Customization Options

Project-based AHU buyers need flexibility within ±20% of base mould. 4 axes per tender.

Panel size

Base mould 1.2 × 2.4 m covers ±20% (0.96–1.44 m × 1.92–2.88 m). Outside range: insert moulds (+USD 60K–140K per new size).

Insulation spec

PU foam 30 / 50 / 80 / 100 / 120 / 150 mm. Foam density 38–50 kg/m³ tuned for acoustic + thermal target.

Acoustic target

Standard (no chamber) / LEED healthcare STC 40+ / data-center STC 50+. ISO 717-1 test chamber optional (+USD 65K–140K).

Steel & finish

PPGI / PPGL / stainless skin. 0.5 / 0.6 / 0.8 mm gauge. Brand decal placement, RAL color match for project tenders.

Foam Quality Visualization — what closed-cell structure actually looks like

The single biggest predictor of refrigerator cabinet thermal performance is the foam cell structure. Closed-cell ratio, average cell diameter and density uniformity decide whether your cabinet holds -18°C in 35°C ambient — or fails the EU Ecodesign type-test. Here's what fine and coarse PU foam look like under a scanning electron microscope.

SEM micrograph of coarse PU foam — large irregular open cells, low closed-cell ratio
Coarse foam · low grade

Industry-typical low-grade PU

Avg cell diameter
~400 µm
Closed-cell ratio
85–90%
k-factor (W/m·K)
0.025–0.028
Density uniformity
±5 kg/m³

Visible voids, broken cell walls, large irregular cells. Refrigerator cabinet pull-down test fails at 32°C+ ambient. EU Ecodesign type-test fails first submission.

SEM micrograph of fine UREXCEED PU foam — small uniform polygonal closed cells, high closed-cell ratio
Fine foam · UREXCEED grade

Our cyclopentane PU system

Avg cell diameter
~100 µm
Closed-cell ratio
≥95%
k-factor (W/m·K)
0.019–0.021
Density uniformity
±0.5 kg/m³

Uniform fine cells, intact walls, high closed-cell ratio. Refrigerator cabinet pull-down test passes at 43°C tropical ambient. EU Ecodesign / WHO PQS / ENERGY STAR first-submission pass rate 90%+.

How we measure it: Every shipment of PU raw materials runs through pilot foaming + SEM cell-structure check at our lab. Every commissioned line gets a foam parameter card with these targets — if your operators tune to the card, the foam structure stays in this range. Sample reports available on request.

Illustration · Conceptual SEM micrographs representing typical industry coarse foam (left) vs UREXCEED cyclopentane PU foam quality target (right). Real SEM reports from your specific line available after commissioning.

Application Scenarios

AHU cabinets land in commercial, healthcare, and project tender markets.

  • Commercial building HVAC AHU cabinet (office / retail)
  • Healthcare AHU (hospital / clinic, LEED-compliant STC 40+)
  • Data center AHU cabinet (acoustic STC 50+, high-load tropical)
  • Industrial AHU (manufacturing plant air handling)
  • Cleanroom AHU cabinet (pharmaceutical / electronics)
  • Project-tender AHU (school / government building HVAC contract)

Вопросы, которые задают владельцы заводов

Каков типичный объём инвестиций в линию вспенивания панелей AHU?
USD 580K–1.2M для линии 200 комплектов шкафов/сутки. Включает машины для вспенивания (USD 220K–380K), пресс-формы для вспенивания (USD 140K–280K для 4 типоразмеров панелей), монтажную оснастку (USD 120K–220K) и испытательное оборудование (USD 80K–180K). Меньше, чем в линиях для холодильников: нет вакуумного формования, пресс-форм дверей, зарядки холодильным агентом.
Можете ли вы поставить полный HVAC-завод (компрессоры, конденсирующие блоки)?
Нет — строго вспенивание панелей корпусов AHU. Компрессоры, конденсирующие блоки, системы хладагента, вентиляторные двигатели, автоматика — всё вне нашей области. Обращайтесь к специализированному HVAC-подрядчику (интеграторы-партнёры Daikin, Carrier, Trane). Мы занимаемся уровнем панелей корпуса; HVAC-интегратор отвечает за всё внутри шкафа.
Поддерживаете ли вы нестандартные размеры AHU для проектных заказов?
Да — OEM-бизнес AHU в значительной мере проектный (каждый строительный объект задаёт свои размеры AHU). Пресс-формы для вспенивания модульные и перенастраиваемые для нестандартных размеров в пределах ±20% от базовых размеров пресс-форм. Действительно нестандартные размеры (крупный промышленный AHU) требуют отдельных инвестиций в пресс-формы USD 60K–140K за новый типоразмер.
Каков срок поставки линии вспенивания для AHU?
Пресс-формы для вспенивания: 45–60 дней проектирование + изготовление. Машины для вспенивания: 45–60 дней параллельно. Интеграция линии: 60–90 дней. Морская доставка: 30–45 дней. Пусконаладка: 30–45 дней. Итого: 5–7 месяцев от подписания контракта — быстрее, чем линии для холодильников, поскольку конструкция шкафа проще (плоские панели, нет дверей, нет стекла).
Можете ли вы поставить акустическое испытательное оборудование для шкафов AHU?
Да — акустическая испытательная камера (измерение звукопотерь по ISO 717-1) является опциональным аксессуаром USD 65K–140K. Необходима при обслуживании программ HVAC для здравоохранения, дата-центров или зданий с сертификацией LEED, где акустическая спецификация закреплена контрактом. Стандартные коммерческие программы AHU, как правило, не требуют её.

Optional Add-ons

Extend Your Production Line

Five proven add-ons our 1,800+ customers ask for after their first refrigerator factory line goes live. Discuss with our engineers which fit your spec.

Raw Material Supply

PU MDI / Polyol systems sourced direct from BASF / Covestro / Wanhua, calibrated to your foam specs and climate. Container-load discounts.

Spare Parts Package

2-year wear-parts package — seals, valves, heating elements, sensors. Pre-shipped with the line, no air-freight emergencies.

Robot Integration

ABB / KUKA 6-axis robot for de-molding, demoulding, palletizing or insertion of internal components — boost throughput +30%.

Automatic Demoulding System

Vacuum-assisted demoulding for thin-wall liners and complex geometries — eliminates worker injury, halves cycle time.

Quality Inspection System

Inline foam density, void, k-factor + dimensional QC stations. Auto-reject + traceability log — meets ISO 9001 + EU appliance regulation.

ROI · Cost Analysis

Investment Range & Payback

Indicative range based on 1,800+ delivered lines. Final pricing depends on automation level + add-ons + local labor cost. Request a quote for your spec.

Investment
USD 600K – 2.0M
Payback
16–26 months
Annual Throughput
30K–100K cabinet sets/year

Configuration note: Scope = cabinet panels only (we do NOT supply coils / fans / motors). Standard config USD 600K–1.2M. Add LEED/healthcare acoustic test chamber (STC 40+): +USD 65K–140K.

Service & Support

Гарантия и сервис

Выезд на объект возможен во всех регионах, куда мы поставляли проекты.

On-Site Installation

Our engineers fly to your factory to supervise installation, layout verification, and first-run production.

Commissioning + Tuning

Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.

Operator Training

5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.

3-Year Warranty + Spares

Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.

home.stats.heading

Turnkey Production Lines for Refrigeration Equipment Factories

30
home.stats.years
1800+
home.stats.projects
40+
home.stats.countries
10,000+ m²
Factory Area
ISO·CE·RoHS
Certified Quality
Chuzhou·Kunshan
Cluster Network

"From a Single Pump to a Turnkey Line — One Partner Through Every Tier."

Запросить индивидуальное КП для этой линии