Manual Rotary 4-Station Door Foaming Specialty Machine — CE / ISO 9001-certified production lines by UREXCEED. Lead time 45 – 75 days, MOQ 1 set.
Manual Rotary 4-Station Door Foaming Specialty Machine
Manual rotary 4-station door foaming machine for R&D, pilot, sample production and low-volume premium refrigerator door foaming. 90-second cycle, 30 kW, 150–400 doors/shift. Cost-effective sample-run option before committing to full crawler / hub line.
Engineering reply within 24 hours
Quote + spec sheet + tailored sizing recommendation. WhatsApp answered 9 am–6 pm Beijing time.
Specyfikacja techniczna
- Layout Form
- Manual rotary 4-station door foaming specialty machine
- Drive Method
- Manual rotation + hydraulic clamping (workshop-grade)
- Heating Method
- Water heating
- Number of Stations
- 4
- Fixture Template Size
- 1,400 × 900 mm (door panel)
- Mold Closing Height
- 200 mm
- Production Cycle Time
- ~90 seconds per door (manual cycle)
- Foaming Material
- POL + Cyclopentane + ISO / POL + HCFC-141a + ISO / POL + HCFC-245fa + ISO
- Voltage / Frequency
- 380V · 50 Hz · Control voltage 24V
- Total Power
- Approx. 30 kW
- Compressed Air Requirement
- 0.5 MPa
- Best Fit Capacity
- ~150 – 400 doors per shift (low-volume / pilot / sample)
- Lead Time
- 45 – 75 days
- MOQ
- 1 set
Zastosowania
- Sample / pilot door foaming for new cabinet variants
- Low-volume premium refrigerator door (small batch certified)
- R&D / prototype door foaming (variant verification before main line)
- Trial production of new door materials / formulations
- Workshops with <500 doors/shift demand
The manual rotary 4-station door foaming specialty machine is the R&D / pilot / sample-run equivalent for door production. Same principle as the single-station cabinet machine: same fixture template as production lines, but one cycle at a time with manual rotation. Use it for new door design verification, low-volume premium variants, or as a cost-effective entry into refrigerator door production.
When manual 4-station door specialty makes sense
Buy this machine when (a) your daily door demand is < 500 (any production line is over-investment), (b) you're verifying new door designs before committing to full line tooling, (c) you produce premium / R&D variants in small batches where unit cost matters less than time-to-market. Many refrigerator OEM factories use this for prototype work + main line for volume.
Four reasons manual 4-station beats automated lines for R&D / pilot door work
Engineering and economics of the manual specialty configuration.
Capex USD 60K–120K — 1/8 of a 6-station servo line
6-station servo line: USD 480K–720K. Manual 4-station specialty: USD 60K–120K turnkey. For R&D / pilot / specialty work where unit throughput is secondary, the manual is the right capex sizing.
Same fixture template as production lines — direct trial-to-production path
The 1,400 × 900 × 200 mm fixture matches the 16-station crawler line exactly. A door design verified on the manual goes straight to crawler tooling — no re-engineering. R&D cycle shortens 4–8 weeks vs trialing on incompatible smaller fixtures.
Capacity 150–400 doors/shift covers small-batch + variant trial
Manual cycle ~90 seconds per door = ~320 doors/shift theoretical, 150–400 realistic with variant changes. Handles R&D pilot batches, premium specialty SKUs, and low-volume certified doors (vaccine / pharma refrigerator).
Lower operator skill requirement — manual = easier training
No PLC recipe management, no servo calibration, no high-pressure hydraulics. 1 operator + 1 PU machine operator. New operator productive within 2–3 days. Servo / crawler lines need 5–7 days training + ongoing PLC literacy.
How the manual 4-station rotary cycle runs
90-second cycle per door. 4 stations rotate manually with hydraulic clamping at each station.
- 1
Station 1 (Load) — operator loads pre-skinned door panel + inner liner onto fixture position 1. Manual position-check with reference marks. ~30 sec.
- 2
Station 1 (Clamp + Inject) — operator engages hydraulic clamp via foot-pedal. PU mix-head dispenses POL+ISO+cyclopentane (0.7–1.4 kg/door). ~20 sec.
- 3
Rotate to Station 2 — operator manually rotates hub 90° to advance the door to station 2 for curing. ~5 sec rotation.
- 4
Stations 2–4 (Manual cure rotation) — door cures in heated fixture (water-jacket 45–55°C) for ~3.5 minutes across 3 stations. Operator works on next door in parallel. ~210 sec.
- 5
Station 4 (Demould) — operator releases clamp, lifts cured door onto outfeed cart. Spot-check density before downstream. ~25 sec.
FAQs — manual rotary 4-station door foaming specialty machine
Investment + lead time?
Capacity 150–400 doors/shift — what kind of factory size?
Can it scale to a full line later?
What's the operator skill requirement?
What end products does it foam?
When NOT to buy a manual 4-station door specialty?
Powiązane produkty
26-Station Ground-Rail PU Foaming Line for Refrigerator Doors — Closed-Loop Track Layout
Closed-loop ground-rail PU foaming line dedicated to refrigerator and cabinet DOOR foaming. 26 fixture stations on a continuous steel track, 20-sec cycle, 3,000–6,000 doors per shift. 2,000 × 900 mm fixture × 200 mm closing height — sized for door panels. Cyclopentane + ATEX Zone 1, steam or oil heating.
Linear Cabinet PU Foaming Line — 6 / 8 / 11 Stations Configurable
Linear in-line PU foaming for refrigerator cabinet body. Scalable from 6-station motor-driven (~800–2,500 cabinets/shift, small-medium factories) to 11-station hydraulic (~4,000–6,000 cabinets/shift, mainstream OEM). Multi-spec mixed-line production. Cabinet size 800–2,000 mm L × 450–2,000 mm W × 450–900 mm H. Water-heated, PID-controlled.
7-To-8 Station Rotary-Door PU Foaming Line (Door-Dedicated Hub)
Rotary (hub-type) door foaming line dedicated to refrigerator and cabinet DOOR foaming. 7–8 stations · 46-second cycle · compact 33 m² footprint · ~65 kW · fast variety changeover.
Cross-Sell · One-Partner Synergy
Match Your Production Line With Factory Solutions
Pick the factory type that matches your buyer market — we engineer the complete production line for that vertical.

Browse 13 Factory Solutions
Refrigerator / Chef Base / Freezer / Display Cabinet / Commercial Freezer + 8 specialized markets.
Learn more
PU Foaming Machines
High-pressure (cyclopentane / 2C / 3C) + low-pressure + spray-foam — pick the foaming line that matches your factory.
Learn more
Refrigerator-Grade Moulds
Vacuum-forming + foaming moulds engineered to your cabinet/door geometry. Custom mould design service available.
Learn moreService & Support
Warranty & Service
On-site intervention available in every region where we have delivered projects.
On-Site Installation
Our engineers fly to your factory to supervise installation, layout verification, and first-run production.
Commissioning + Tuning
Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.
Operator Training
5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.
3-Year Warranty + Spares
Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.
Często zadawane pytania
What is the typical lead time?
What is the minimum order quantity?
Do you offer customization and OEM / ODM?
What certifications does this product have?
Potrzebujesz kompleksowego rozwiązania chłodniczego?
UREXCEED integruje formy, maszyny do pianki, linie produkcyjne i materiały z 6 fabryk partnerskich. Podaj cel kapacytetowy, w 24h przedstawimy konfigurację i wycenę.