Manual Rotary 4-Station Door Foaming Specialty Machine — refrigerator cabinet & door pu foaming lines by UREXCEED. Lead time 45 – 75 days, MOQ 1 set.

Manual Rotary 4-Station Door Foaming Specialty Machine

Manual Rotary 4-Station Door Foaming Specialty Machine

Manual rotary 4-station door foaming machine for R&D, pilot, sample production and low-volume premium refrigerator door foaming. 90-second cycle, 30 kW, 150–400 doors/shift. Cost-effective sample-run option before committing to full crawler / hub line.

Lead Time
45 – 75 days
Minimum Order
1 set

Start with an engineering scope review

Send dimensions, target output and drawings. Response timing follows project complexity and working hours.

Specifications

Layout Form
Manual rotary 4-station door foaming specialty machine
Drive Method
Manual rotation + hydraulic clamping (workshop-grade)
Heating Method
Water heating
Number of Stations
4
Fixture Template Size
1,400 × 900 mm (door panel)
Mold Closing Height
200 mm
Production Cycle Time
~90 seconds per door (manual cycle)
Foaming Material
POL + Cyclopentane + ISO / POL + HCFC-141a + ISO / POL + HCFC-245fa + ISO
Voltage / Frequency
380V · 50 Hz · Control voltage 24V
Total Power
Approx. 30 kW
Compressed Air Requirement
0.5 MPa
Best Fit Capacity
~150 – 400 doors per shift (low-volume / pilot / sample)
Lead Time
45 – 75 days
MOQ
1 set

Applications

Sample / pilot household refrigerator door — manual R&D variant verification
Specialty door foaming — low-volume premium variant
Small-batch certified door — vaccine / pharma refrigerator (pilot)
Premium / R&D door foaming — manual specialty configuration
  • Sample / pilot door foaming for new cabinet variants
  • Low-volume premium refrigerator door (small batch certified)
  • R&D / prototype door foaming (variant verification before main line)
  • Trial production of new door materials / formulations
  • Workshops with <500 doors/shift demand

The manual rotary 4-station door foaming specialty machine is the R&D / pilot / sample-run equivalent for door production. Same principle as the single-station cabinet machine: same fixture template as production lines, but one cycle at a time with manual rotation. Use it for new door design verification, low-volume premium variants, or as a cost-effective entry into refrigerator door production.

When manual 4-station door specialty makes sense

Buy this machine when (a) your daily door demand is < 500 (any production line is over-investment), (b) you're verifying new door designs before committing to full line tooling, (c) you produce premium / R&D variants in small batches where unit cost matters less than time-to-market. Many refrigerator OEM factories use this for prototype work + main line for volume.

Four reasons manual 4-station beats automated lines for R&D / pilot door work

Engineering and economics of the manual specialty configuration.

#1

Capex USD 60K–120K — 1/8 of a 6-station servo line

6-station servo line: USD 480K–720K. Manual 4-station specialty: USD 60K–120K turnkey. For R&D / pilot / specialty work where unit throughput is secondary, the manual is the right capex sizing.

#2

Same fixture template as production lines — direct trial-to-production path

The 1,400 × 900 × 200 mm fixture matches the 16-station crawler line exactly. A door design verified on the manual goes straight to crawler tooling — no re-engineering. R&D cycle shortens 4–8 weeks vs trialing on incompatible smaller fixtures.

#3

Capacity 150–400 doors/shift covers small-batch + variant trial

Manual cycle ~90 seconds per door = ~320 doors/shift theoretical, 150–400 realistic with variant changes. Handles R&D pilot batches, premium specialty SKUs, and low-volume certified doors (vaccine / pharma refrigerator).

#4

Lower operator skill requirement — manual = easier training

No PLC recipe management, no servo calibration, no high-pressure hydraulics. 1 operator + 1 PU machine operator. New operator productive within 2–3 days. Servo / crawler lines need 5–7 days training + ongoing PLC literacy.

How the manual 4-station rotary cycle runs

90-second cycle per door. 4 stations rotate manually with hydraulic clamping at each station.

  1. 1

    Station 1 (Load) — operator loads pre-skinned door panel + inner liner onto fixture position 1. Manual position-check with reference marks. ~30 sec.

  2. 2

    Station 1 (Clamp + Inject) — operator engages hydraulic clamp via foot-pedal. PU mix-head dispenses POL+ISO+cyclopentane (0.7–1.4 kg/door). ~20 sec.

  3. 3

    Rotate to Station 2 — operator manually rotates hub 90° to advance the door to station 2 for curing. ~5 sec rotation.

  4. 4

    Stations 2–4 (Manual cure rotation) — door cures in heated fixture (water-jacket 45–55°C) for ~3.5 minutes across 3 stations. Operator works on next door in parallel. ~210 sec.

  5. 5

    Station 4 (Demould) — operator releases clamp, lifts cured door onto outfeed cart. Spot-check density before downstream. ~25 sec.

FAQs — manual rotary 4-station door foaming specialty machine

Investment + lead time?
USD 60K–120K turnkey, 45–75 days lead time. Includes 4-station manual rotary fixture with hydraulic clamping, water-heated platens, PU machine (smaller volume, cyclopentane optional), control panel, on-site commissioning + 3 days training.
Capacity 150–400 doors/shift — what kind of factory size?
Door production at 300/shift × 250 days × 1 shift = 75,000 doors/year. Covers premium / specialty refrigerator OEM (vaccine fridges, high-end home, custom commercial). For mainstream OEM at 500K+ doors/year, move to crawler 16-station or ground-rail 26.
Can it scale to a full line later?
Yes — by design. The 4-station fixture template matches the 16-station crawler line. Same door designs, same recipe, same fixture geometry. When demand grows, the door designs carry forward to crawler tooling without re-engineering. PU machine may need upgrade (manual uses 30 kg/hour, crawler needs 200+ kg/hour).
What's the operator skill requirement?
Basic mechanical aptitude. No PLC programming, no servo calibration, no high-pressure hydraulics. Training: 2–3 days on-site. Operator turnover impact: minimal — process is mostly manual + hydraulic, not software-mediated.
What end products does it foam?
Sample / pilot refrigerator doors (R&D new variant verification), low-volume premium refrigerator doors (custom hotel chain, designer brand), small-batch certified doors (vaccine / pharma WHO-PQS), specialty doors with thicker / non-standard PU core (380 mm deep mould height supports vaccine refrigerator).
When NOT to buy a manual 4-station door specialty?
Above 500 doors/shift demand → 6-station servo or crawler 16-station per-door cost wins. If you need cosmetic-grade ±0.1 mm door fit → 6-station servo precision beats manual ±0.5 mm. If your door variant mix is < 2 SKUs → ground-rail 26-station closed loop pays back faster.

Service & Support

Warranty & Service

On-site intervention available in every region where we have delivered projects.

On-Site Installation

Our engineers fly to your factory to supervise installation, layout verification, and first-run production.

Commissioning + Tuning

Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.

Operator Training

5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.

3-Year Warranty + Spares

Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.

Frequently Asked Questions

What is the typical lead time?
45 – 75 days. Lead time depends on configuration, quantity, and destination. Sea freight adds 20–45 days depending on your port.
What is the minimum order quantity?
1 set. For OEM projects with custom specifications, MOQ may increase. Small-batch pilot orders can be discussed case by case.
Do you offer customization and OEM / ODM?
Yes. We integrate moulds, foaming machines, production lines and materials from our partner factories. Custom sizes, voltages (110V/220V/380V, 50Hz/60Hz), PLC brands, colours and branding are supported. We also provide full-line turnkey solutions for refrigerators, freezers, cold rooms and insulation boxes.
What certifications does this product have?
Applicable compliance documents are confirmed against the quoted model and destination. Request the certificate holder, covered model, scope and validity before order confirmation.

Need a Full Refrigeration Solution?

we integrates moulds, foaming machines, production lines and materials across 6 partner factories. Tell us your capacity target and we will reply with a configuration and quote within 24 hours.