Certified. Tested. Warrantied.

Every project passes through our documented quality system: inbound supplier audit, in-process inspection, pre-shipment Factory Acceptance Test (FAT), on-site commissioning, and post-delivery warranty tracking. Certifications below are maintained at system level and verified annually.

5-Stage Quality System

Every project — from a single mould to a full turnkey line — passes through the same documented five-stage process.

01

Supplier Audit & Pre-qualification

Every mould and machinery maker in our network passes annual on-site audits covering ISO 9001 quality system, production capacity, in-house testing facilities and historical delivery record. Only pre-qualified suppliers handle UREXCEED orders.

02

Inbound Material Inspection (IQC)

Every raw material batch (P20/2738/H13 mould steel, PU isocyanate/polyol, electrical components) is verified against mill certificates. Mould steel hardness, chemical composition and dimensional tolerance are tested before machining begins.

03

In-Process Quality Control (IPQC)

During machining and assembly, critical dimensions and surface finish are measured at defined control points. Deviations trigger immediate stop-and-correct. All measurements are logged and included in the final quality dossier handed to the client.

04

Pre-shipment Factory Acceptance Test (FAT)

Before any equipment ships, it runs a full production cycle at the supplier factory. Clients (or their inspection agents — SGS / BV / TÜV / Intertek) are invited to witness the FAT. Written FAT reports are issued for every project.

05

On-Site Commissioning & Warranty Tracking

Our engineers fly to the client's factory to supervise installation, first-run production, and operator training. Post-commissioning, every project is tracked in our warranty system for three years, with proactive spare parts and annual health-check reminders.

Quality Control in Action

What the five-stage system looks like on the shop floor — actual checkpoints, not marketing language.

Incoming Material Inspection

Incoming Material Inspection

Every mould steel billet, PU raw material barrel, and electrical component is dimensionally verified and cross-checked against mill certificates before it enters production.

In-Process Monitoring

In-Process Monitoring

PU foaming pressure, temperature, density and cycle time are logged in real time at every station. Any deviation from the production recipe triggers an immediate stop-and-correct action.

Pre-Shipment Acceptance Test

Pre-Shipment Acceptance Test

Every line runs a full production cycle on the supplier factory floor before shipping. Clients (or SGS / BV / TÜV / Intertek inspectors) are invited to witness, and a written FAT report is issued.

Testing Methods & Standards

Our equipment and materials are tested against the standards your buyers require.

ISO 9001:2015
Quality Management System — annual third-party audit by SGS
CE (Machinery Directive 2006/42/EC)
Safety compliance for machinery supplied to EU markets
CE (Low Voltage Directive 2014/35/EU)
Electrical safety for all powered equipment
RoHS
Restriction of hazardous substances in electrical components
ASTM E84 Class A
Surface burning characteristics for PU insulation foam — critical for cold storage and medical cabinets
ASTM D1622 / D1623
PU foam density and tensile strength verification

Our Certifications

ISO
ISO 9001:2015
Quality Management System
CE
CE
European Safety Standards
RoHS
RoHS
Restriction of Hazardous Substances
ASTM
ASTM E84 Class A
Flame Spread / Smoke Developed

Full certificate scans and latest audit reports are available on request — see the CTA below.

Warranty & Service

UREXCEED stands behind every line we deliver with a documented, non-boilerplate warranty — because a refrigeration equipment factory that stops is money lost, and downtime support matters more than the price on the quote.

Core Equipment
3 years from commissioning — covers moulds, PU foaming machines, production line mechanics and control systems
Electrical Components
2 years — PLCs, HMIs, servos, sensors (Siemens / Mitsubishi OEM warranty pass-through)
Consumables
90 days — seals, gaskets, filters, belts (stocked in our warehouse for 24-hour dispatch)
Response Time
Remote diagnosis within 4 hours. On-site intervention within 72 hours to any country where we have delivered a project
Spare Parts
Critical spare parts kit shipped with every line — covers typical wear parts for first 12 months of operation

Global Service Footprint

On-site intervention available in every region where we have delivered projects.

Russia, CIS & Central Asia Latin America Middle East & North Africa Southeast Asia North America Europe

Request Our Quality Documentation

TDS, SDS, FAT report samples, ISO 9001 certificate, and customer testimonials are available on request for serious project enquiries.

Request Quality Pack