PU Spray Foam Machine (UPM-SPRAY-20) is a CE-certified pu foaming machines product manufactured by UREXCEED. Lead time: 30 – 45 days. MOQ: 1 set. Key applications: On-site cold room spray insulation, Truck body insulation, Roof insulation.

PU Spray Foam Machine

UPM-SPRAY-20

PU Spray Foam Machine

Mobile spray insulation system, 5–20 kg/min

Lead Time
30 – 45 days
Minimum Order
1 set

Specifications

Output
5 – 20 kg/min
Heating
Electric hose heating to 80°C
Pressure
100 – 160 bar
Hose Length
10 – 60 m configurable

Applications

  • On-site cold room spray insulation
  • Truck body insulation
  • Roof insulation

Certifications

CE

Frequently Asked Questions

What is the typical lead time?
30 – 45 days. Lead time depends on configuration, quantity, and destination. Sea freight adds 20–45 days depending on your port.
What is the minimum order quantity?
1 set. For OEM projects with custom specifications, MOQ may increase. Small-batch pilot orders can be discussed case by case.
Do you offer customization and OEM / ODM?
Yes. We integrate moulds, foaming machines, production lines and materials from our partner factories. Custom sizes, voltages (110V/220V/380V, 50Hz/60Hz), PLC brands, colours and branding are supported. We also provide full-line turnkey solutions for refrigerators, freezers, cold rooms and insulation boxes.
What certifications does this product have?
This product complies with: CE.

Service & Support

Warranty & Service

On-site intervention available in every region where we have delivered projects.

On-Site Installation

Our engineers fly to your factory to supervise installation, layout verification, and first-run production.

Commissioning + Tuning

Trial run + parameter tuning to your local raw material, climate, and target product spec — until throughput meets contract.

Operator Training

5-10 day on-site training for production team, QC, and maintenance — bilingual manuals + video tutorials provided.

3-Year Warranty + Spares

Core equipment 3-year warranty, electrical 2-year. Spare parts in stock with global express shipment 24h dispatch.

home.stats.heading

Turnkey Production Lines for Refrigeration Equipment Factories

30
home.stats.years
1800+
home.stats.projects
40+
home.stats.countries
10,000+ m²
Factory Area
ISO·CE·RoHS
Certified Quality
Chuzhou·Kunshan
Cluster Network

"From a Single Pump to a Turnkey Line — One Partner Through Every Tier."

Need a full refrigeration solution?

UREXCEED integrates moulds, foaming machines, production lines and materials across 6 partner factories. Tell us your capacity target and we will reply with a configuration and quote within 24 hours.